My depiction of the new pump inside the borewell |
This time we are making a bold decision. With friendly engineers from ABS, we have decided we will do the following;;
New Pump scheduled to reach farm. The first one is a filter and the other is the pump |
My estimate is as is it will give 30% more water.
2. Once this stabilises, now we need to increase the vertical movement of rod assembly at the windmill by replacing a crank shaft. That will utilise the 350 mm depth of the pump to a large extent. Currently the verticle movement is only 100mm. We need to make it atleast 200 or 250 mm. That will give 4 times more water than what I am getting.
ABS is ready to do both the changes. But they are doubting if due to increased load, the rod assembly will bend. I am confident it will not.
decided to take a risk. After all what is life without risk.