Monday, 7 April 2014

Foundation Dressed up

I got an update of the farm today. Subbu had to travel to nearby town to upload these snaps.  The work is satisfactory.  The tower foundation for wind pump has been dressed up and ready.  We have taken a call not to put an upper slab as the foundation itself is very solid. Upto a depth of 4 Feet on solid ground.  The top slab is found to be irrelevant as of now unless ABS compels it. (Process oriented companies generally kill creativity. I hope ABS is not !!)


Along side as a bonus we also have got the snaps of live fence growth.  Looks good. But the heat is visible very much. Plenty of water is required to reduce the temperature.  Must be a hard work for the guys over there now.

Bougainvilla blossoms

Causarina 