The boring head in resting position |
Modern boring of 6" require two lorries. One supplies compressed air. The other is actually the boring machine. |
Now some note on boring.
Almost Done. Only outer to be fixed. |
Boring completed. The man is attaching a short pipe above ground level to the outer pipe. |
Our guess was not bad. We hit water at 165 feet. Again at 190 feet and again at above 250 feet. Subbu became greedy and went upto 325 feet, whereas I had budgeted for 300 feet come what may.
The borewell will be called "Kandan Kinaru" in tribute to Kandan's accurate guess work.
The only downside is this one is not very far from the earlier one. Having two borewells around 200 feet apart and still you have a corner of farm away from you is fine.
It costs around Rs. 60/- per feet. (one dollar). Then you have "outer" PVC pipe of 20 feet that is required to dress the first 20 feet to keep the mud packed from falling inside. So total should come around 26K. you settle only then lorry will leave the farm.
The borewell with outer in place. The bore width is 6.5" Lorry is yet to move away |
Now some visuals.....
The sight is a mixture of rock dust and water mixture sprewen around the borewell extending and flowing into neighboring field as well. I hope he will not object to this dirt.
We are yet to think of how to pump water now.
My earlier idea is to get a slow speed dieseal pump and compressor. But now Subbu is confident of getting some electricity by talking to officials. Not the industrial one, but domestic current.
Let's hope the best.
One by one people are moving away. Pack and go. The fresh borewell will be tied with gunny bag till mason builds a cement structure around. |